This is a photo of the crane that we brought in to drill our auger pilings. We used this method, as opposed to driving the pilings, so that it would be quieter and have less vibration. We drilled 323 pilings at an average of 50 feet deep to pass the load of the building to the rock below. Berkel, the contractor who did the drilling, finished up in late March.