Wednesday, July 23, 2008



We have begun preparing for the interior slabs and have poured this 3,000 square foot section already. We will be doing 2 pours a week.

posted by French Broad Place @ 10:31

<< Home

Previous Posts

  • As this picture shows, we have completed the ere...
  • The structure began going up two weeks ago. This...
  • It's very impressive, probably the biggest crane...
  • The crane has a 230 ton capacity and the boom is ...
  • By May 20, 2008 we finished the on-grade foundatio...
  • Concrete pump used to pour the footers. There w...
  • Our grade beams for our foundation are being hand...
  • The two panels on the right with brick are some ...
  • This is a photo of the crane that we brought in ...
  • In January of 2008 we installed our underground ...

Subscribe to
Posts [Atom]

French Broad Place in Brevard, North Carolina unites urban architecture with Brevard's historic downtown. Copyright © 2007 Steve Owen & Associates. All Rights Reserved.
Site by Applied Solutions