- As this picture shows, we have completed the ere...
- The structure began going up two weeks ago. This...
- It's very impressive, probably the biggest crane...
- The crane has a 230 ton capacity and the boom is ...
- By May 20, 2008 we finished the on-grade foundatio...
- Concrete pump used to pour the footers. There w...
- Our grade beams for our foundation are being hand...
- The two panels on the right with brick are some ...
- This is a photo of the crane that we brought in ...
- In January of 2008 we installed our underground ...