• Home
  • Live
  • Work
  • Play
  • Floorplans
  • Amenities
  • Rooftop Gardens
  • Updates
  • Contact
  • Explore Brevard, NC

Monday, June 16, 2008

The structure began going up two weeks ago. This picture is about a week old, so it only shows about half of the progress. Thi section is the corner of French Broad and Caldwell.It is built up to the roof and is a bit longer to the left in this picture.

posted by French Broad Place @ 09:26

Previous Posts

  • The structure began going up two weeks ago. This...
  • It's very impressive, probably the biggest crane...
  • The crane has a 230 ton capacity and the boom is ...
  • By May 20th of 2008, we have finished the foundat...
  • Concrete pump used to pour the footers. There w...
  • Our grade beams for our foundation are being hand...
  • The two panels on the right with brick are some ...
  • This is a photo of the crane that we brought in ...
  • In January of 2008 we installed our underground ...
  • We hand sifted through the rubble and removed al...

Archives

  • March 2008
  • April 2008
  • May 2008
  • June 2008
  • Current Posts

Subscribe to
Posts [Atom]

French Broad Place in Brevard, North Carolina unites urban architecture with Brevard's historic downtown. Copyright © 2007 Steve Owen & Associates. All Rights Reserved.
Site by Applied Solutions