Wednesday, July 23, 2008
We have begun preparing for the interior slabs and have poured this 3,000 square foot section already. We will be doing 2 pours a week.
posted by French Broad Place @
10:31
As this picture shows, we have completed the erection of the structure down French Broad Street and have turned the corner. This photo shows the height of the building at its highest point, the fifth floor element of the main penthouse.
posted by French Broad Place @
10:28
Previous Posts
We have begun preparing for the interior slabs a...
As this picture shows, we have completed the ere...
The structure began going up two weeks ago. This...
It's very impressive, probably the biggest crane...
The crane has a 230 ton capacity and the boom is ...
By May 20, 2008 we finished the on-grade foundatio...
Concrete pump used to pour the footers. There w...
Our grade beams for our foundation are being hand...
The two panels on the right with brick are some ...
This is a photo of the crane that we brought in ...